Cooper commences production at Parsons

Cooper Energy, Australia’s mid-sized oil and gas exploration and production company, has commenced production from its Parsons Oil Field facility in PEL92 in the Cooper Basin, in Southern Australia.
The company informed its shareholders that the Parsons-1 well was brought on-line through the facilities at 2,640 barrels of oil per day (660 barrels of oil per day Cooper Energy Share) with a flowing tubing head pressure of 154 psig through a ½” choke.
The company hopes to brought Parsons-2 on-line through the facilities in the next 2 weeks and will add to the production capacity of the Parsons Oil Field.
Production off-take from the facility will be stabilised and optimised in the following weeks.
The Parsons Oil Field is expected to yield over 1.4 million barrels of recoverable oil (P50 confidence level, 0.4 million barrels Cooper Energy share) thereby boosting Cooper Energy’s mid-year developed recoverable oil (proved) portfolio.
Related news to Cooper commences production at Parsons
Previous: « Newfield starts production offshore Malaysia
Next: Brigham reports gas discovery »
Visited 1612 times, 1 so far today
Crude prices drop as US GDP slows in second quarter