MEO Australia announces discovery

MEO Australia Limited advises the market that following careful analysis of the production testing results and electric log data through the Heron North Elang/Plover sandstone unit, formal declaration of a discovery pursuant to clause 34 of the Petroleum (Submerged Lands) Act 1967 has been made to the Designated Authority.
Heron-2 was drilled by Seadrill’s West Atlas jack-up rig contracted to MEO for two firm wells. The Heron-2 well penetrated the Epenarra Darwin Formation and the deeper Elang/Plover Formation of the Heron North structure. Electric logging indicated that both of the target reservoirs were gas saturated.
Production testing of the Heron North Elang/Plover sandstone unit recorded a maximum interpreted hydrocarbon flow between 6 and 8 MMscf/day before operations were halted due to the approach of Cyclone Helen. Further testing was not successful due to the partial collapse of the well.
Related news to MEO Australia announces discovery
Previous: « Sunshine sells UK assets for £15m
Next: Solana reports oil discovery in Colombia »
Visited 1540 times, 2 so far today
Crude oil prices mixed as WTI declines, Brent crude gains