Daily Oil Market News
 
Daily Oil Prices & Futures News on the Blackstuff
Monday 06th of October 2008
21/12/2007

Tullow completes Mputa-4 extended well test

Tullow completes Mputa-4 extended well test

Tullow Oil plc announces that Mputa-4 well test operations have been completed and the data taken from the well will now be integrated with the Kaiso-Tonya appraisal programme well data and the recently acquired 3D seismic.

Mputa-4 was production tested from a 5m interval at 944m for an extended flow period of three days from 21 to 24 November 2007. The well tested at rates of 950 to 1,100 bbls/day on a small ½” choke and the oil produced was a 31 degree API waxy sweet crude consistent with that encountered elsewhere in the Kaiso-Tonya Area. The well was then shut-in for an extended 16-day pressure build-up period with downhole reservoir pressure gauges installed.

The objective of the test was to enhance the understanding of the lateral connectivity and geometry of the sandstone reservoir by analysing production and pressure trends. The pressure data indicated some depletion over the test period and this data will now be integrated into the subsurface evaluation along with an updated 3D seismic geological model to refine reserve estimates and development planning assumptions ahead of the anticipated sanction of the Early Production System in late Q1 2008.

 

Add to Bookmarks:

ADD TO NETSCAPE     ADD TO DEL.ICIO.US     ADD TO DIGG     ADD TO FURL

ADD TO STUMBLEUPON     ADD TO YAHOO MYWEB     ADD TO GOOGLE     ADD TO SPURL


Related news to Tullow completes Mputa-4 extended well test







No Comments

No comments yet.

Sorry, the comment form is closed at this time.


Previous: « Petronas to acquire Star Energy
Next: Crude prices up on light trade »

Visited 491 times, 1 so far today