Antrim updates Causeway drilling program

Antrim Energy Inc. announces that the fourth and final well in its 2007 extended Causeway drilling program, has been successfully drilled and will be cased. As previously announced, the well, 211/22a-9, was drilled to provide pressure support to the future oil producers (22a-6 & 22a-7A) in the Central Causeway area.
The well was drilled to total depth 4,281 m (14,045 ft) and encountered sections of oil pay in the Ness and Etive formations despite being drilled at a significantly lower elevation (138 ft) than the producers.
The pay sections have been confirmed by logging and an extensive program of fluid and pressure sampling by Modular Formation Dynamics Tester (MDT) tools which recovered light oil from the Ness sandstone. The structural elevation of these reservoir intervals, combined with the elevations identified in 22a-6 and 22a-7A, translate to a gross oil column of approximately 160 ft in the Central Causeway compartment.
Add to Bookmarks:
Related news to Antrim updates Causeway drilling program
No Comments
No comments yet.
Sorry, the comment form is closed at this time.
Previous: « SPC acquires China Oilfields
Next: Gulf Western spuds fourth Frio well »
Visited 642 times, 1 so far today
Futures Markets