Tap begins development at Woollybutt South

Tap Oil Limited announces that work has started at Woollybutt-4H development well which kicks off the Woollybutt South Development.
The Woollybutt-4H development well is located in permit WA-25-L at a surface location of latitude 20°57′16.17″S and longitude 114°52′06.14″E in the Barrow Sub-basin. The well will be sidetracked from the existing Woollybutt-4 well.
The Songa Venus drilling rig has re-entered the previously drilled Woollybutt-4 well and is drilling out the cement plugs prior to commencing the Woollybutt-4H sidetrack.
Woollybutt-4H will sidetrack from the Woollybutt-4 well and will be drill ed and completed as a horizontal well in the Top Barrow Sandstones which contains a similar oil to the Northern Lobe of the Woollybutt Field.
Add to Bookmarks:
Related news to Tap begins development at Woollybutt South
No Comments »
No comments yet.
Leave a comment
Previous: « Crude gains on refinery problems
Next: Petrobras Light Oil Discovery in Brazil »
Since July 3rd 2007: Visited 806 times, 1 so far today
Futures Markets